prevnext
 
 
 
 

News

left right
  • 2013-03-01

    During the recent days, we have successfully implemented a synchronous disk storage replication solution for clients housed within both our datacenters.

    more>
  • 2013-02-01

    In our continuous effort for providing the best possible services, we have upgraded the european peering lines capacity to 2x10Gbps; the lines are terminated in the Sitel and SIX nodes, providing full redundancy.

    more>
  • 2012-07-01

    As of today, we offer our clients the possibility of placing their technology in two geographically independent data centers.

    more>
  • 2012-05-01

    As of today, we offer a virtual server solution based on the most sophisticated virtualization technology by VMWware.

    more>
  • 2012-04-01

    Recently, we have deployed Cisco Nexus 5000 and 2000 series devices into our network infrastructure.

    more>
  • 2012-02-15

    Today, we have finished the LightStorm Communications backbone upgrade on the LSC-Sitel-SIX-LSC circuit to 20Gbps.

    more>
  • 2012-02-01

    We have upgraded the outgoing lines to 4x10Gbps, terminated in the Sitel and SIX nodes for full redundancy of international connectivity.

    more>
  • 2011-12-15

    In our newest POP3 server room, we introduced closed hot aisles system for the warm air flow control.

    more>
  • 2011-11-25

    Today, we have commissioned a new EMERSON cooling unit with a cooling capacity of 72kW, on demand cooling capacity control and a hot/cold aisle monitoring system.

    more>
  • 2011-11-15

    We offer our clients the possibility to place their tower servers in lockable boxes with contactless card authorization and KVM over IP. Boxes are capable of housing even the biggest tower servers with dimensions HxWxD - 80x35x90cm.

    more>
  • 2010-09-01

    As of today, the slovak peering link capacity is upgraded to 10 Gbps.

    more>
  • 2010-07-15

    In an effort for more ffective client device cooling, we have mnade adjustments in the POP2 server room and we have implemented the closed cold aisles system.

    more>
  • 2010-06-10

    We have upgraded the cooling of the POP2 server room with a 28kW cooling capacity TOSHIBA unit.

    more>
  • 2010-02-01

    In the POP3 server room, we have implemented an automated system of direct power consumption measurements utilizing digital electrometers with data collection.

    more>
  • 2010-02-01

    Today, we have commissioned a new server room POP3. The room is designed to hold 35 racks with 48U height. Each of the racks can be powered through 2 independent feeds backed up via UPS and a diesel generator. Internet connection is supplied via CISCO 6509-VSS 1440 networking unit through either metallic or fiber optic link. If desired, a direct fiber optic link to the SIX or SITEL nodes can be established.

    more>

Why choose LightStorm?

We offer our clients a professional service at a great price using high-tech equipment. Our philosophy is to provide clients with complete and accurate information about services and prices. Therefore, you won't find any unpleasant surprises in the form of hidden fees and our technical support is at your disposal 24/7. We constantly strive to upgrade our technical equipment in order to be able to offer you the best services.

Data rooms

A wide range of collocation services will interest even the most demanding clients - from clients with a single server to clients operating multiple rack solutions. For our clients, we have prepared three server rooms with equipment from leading supporting and networking technologies manufacturers.


Data rooms comparison
Parameter POP1
more
POP2
more
POP3
more
Security service

ok.png

ok.png

ok.png

CCTV monitoring of hallways

ok.png

ok.png

ok.png

Cooling N+1

ok.png

ok.png

ok.png

Humidity control

warning.png

ok.png

ok.png

Antistatic floor

warning.png

ok.png

ok.png

Raised floor

warning.png

ok.png

ok.png

Redundant power supply

ok.png

ok.png

ok.png

Option for power supply from A + B feed

warning.png

ok.png

ok.png

Backup with central UPS

ok.png

ok.png

ok.png

Power backup using diesel generator

ok.png

ok.png

ok.png

Fire detection

ok.png

ok.png

ok.png

Automatic fire suppression

warning.png

warning.png

ok.png

CCTV in data rooms

ok.png

ok.png

ok.png

Electronic security system

ok.png

ok.png

ok.png

WiFi connectivity

ok.png

ok.png

ok.png

24/7 access with RFID card and fingerprint verification

ok.png

ok.png

ok.png

Acces to data rooms 24/7

ok.png

ok.png

ok.png

GSM cover

ok.png

ok.png

ok.png

Redundant interconnect of data rooms

ok.png

ok.png

ok.png

Peering uplink redundancy SIX/Sitel

ok.png

ok.png

ok.png

DDoS protection using Cisco Anomaly Detector + Guard

ok.png

ok.png

ok.png

Supervision 24/7

ok.png

ok.png

ok.png

Space for tower servers

ok.png

warning.png

warning.png

Space for rackmount servers

warning.png

ok.png

ok.png

Remote reboot possibility through APC PDU

ok.png

ok.png

ok.png


Shared parameters across all server rooms:

  • Professional cooling connected in N+1 Toshiba (POP1) and EMERSON (POP2 a POP3)
  • Power supply backup - two independent power feeds
  • Power supply backup - diesel generator Elteco PETRA 250
  • Power supply backup - APC UPS
  • Redundant network infrastructure - two independent fiber connections to SIX and SITEL
  • Redundant network infrastructure - Cisco switches and routers (series 4900, 6500, 7200 and 7600)
  • N*10 Gbps network bandwidth
  • Current connectivity - Slovakia 10Gbps,  Europe 2*10Gbps, World 2*10Gbps
  • No additional aggregation
  • DDoS protection via CISCO Anomaly Detector & Guard
  • Guaranteed service availability - 99.998% yearly
cisco_logo.gif
Emerson_Network_Power_logo.gif
APC_logo.png
TOSHIBA